8. Enigma Building


Item No Description Unit Quantity Rate (Rand) Estimated Amount (Rand) Rate (Rand) BID Amount (Rand) Corrected Amount (Rand) Variance Percent Min Price (Rand) Max Price (Rand) Med Price (Rand)
BILL NO. 1
0 0%
PRELIMINARIES
0 0%
BUILDING AGREEMENT AND PRELIMINARIES
0 0%
The agreement is to be the Form of Offer and Acceptance (Agreement) Part C 1.1 of bid document
0 0%
and
0 0%
The JBCC Principal Building Agreement (March 2014 Edition 6.1) prepared by the Joint Building Contracts Committee shall be the applicable building agreement, amended as hereinafter described
0 0%
The JBCC Principal Building Agreement contract data form an integral part of this agreement
0 0%
The Preliminaries published by the Association of South African Quantity Surveyors for use with the JBCC Principal Building Agreement Edition 6.1 March 2014 shall be deemed to be incorporated in these bills of quantities, amended as hereinafter described
0 0%
The contractor is deemed to have referred to the abovementioned documents for the full intent and meaning of each clause
0 0%
The clauses in the abovementioned documents are hereinafter referred to by clause number and heading only
0 0%
Where any item is not relevant to this agreement such item is marked N/A signifying "not applicable"
0 0%
Where standard clauses or alternatives are not entirely applicable to this agreement such amendments, modifications, corrections or supplements as will apply are given under each relevant clause heading and such amendments, modifications, corrections or supplements shall take precedence notwithstanding anything to the contrary contained in the abovementioned documents
0 0%
PREAMBLES FOR TRADES
0 0%
The Model Preambles for Trades 2008 as published by the Association of South African Quantity Surveyors shall be deemed to be incorporated in these bills of quantities and no claims arising from brevity of description of items fully described in the said Model Preambles will be entertained
0 0%
Supplementary preambles and/or specifications are incorporated in these bills of quantities to satisfy the requirements of this project. Such supplementary preambles and/or specifications shall take precedence over the provisions of the Model Preambles
0 0%
STRUCTURE OF THIS PRELIMINARIES BILL
0 0%
Section A : A recital of the headings of the individual clauses of
0 0%
the aforementioned JBCC Principal Building
0 0%
Agreement
0 0%
Section B : A recital of the headings of the individual clauses of
0 0%
the aforementioned Preliminaries document
0 0%
Section C : Any special clauses to meet the particular
0 0%
circumstances of the project
0 0%
PRICING OF PRELIMINARIES
0 0%
Should the contractor select Option A or where option is prescribed in the contract data for the adjustment of preliminaries, the amounts entered against the relevant items in these preliminaries are to be divided into one or more of the three categories provided namely fixed (F), value related (V) and time related (T)
0 0%
SECTION A: PRINCIPAL BUILDING AGREEMENT
0 0%
Interpretation (A1-A7)
0 0%
1 Clause 1.0 - Definitions and interpretation
CONT 0 0%
Definition of agreement
CONT 0 0%
The definition of agreement is replaced with the following definition :
CONT 0 0%
AGREEMENT : The Form of Offer and Acceptance (Agreement) (Part C.1) and the JBCC Principal Building Agreement, the completed JBCC PBA contract data, the contract drawings, the priced documents and any other documents introduced to in writing and signed by the parties"
0 0%
Pricing of bills of quantities
CONT 0 0%
The contractor is to allow opposite each item for all costs in connection therewith. All prices to include, unless otherwise stated, for all materials, fabrication, conveyance and delivery, unloading, storing, unpacking, hoisting, labour, setting, fitting and fixing in position, cutting and waste (except where to be measured in accordance with the standard system of measurement), patterns, models and templates, plant, temporary works, returning of packaging, duties, taxes (other than Value Added Tax), imposts, establishment charges, overheads, profit and all other obligations arising out of this agreement. Value Added Tax (VAT) is to be separately stated on the summary page of these bills of quantities
CONT 0 0%
Prices for all construction equipment, temporary works, services and other items shall include for the supply, maintenance, operating cost and subsequent removal and making good as necessary
CONT 0 0%
Abbreviated descriptions
CONT 0 0%
The items in these bills of quantities utilise abbreviated descriptions. It is the intention that the abbreviated descriptions be fully described when read with the applicable measuring system and the relevant preambles and/or specifications. However, should the full intent and meaning of any description not be clear, the contractor shall, before submission of his tender, call for a written directive from the principal agent, failing which it shall be assumed that the contractor has allowed in his pricing for materials and workmanship in terms of local and international best practice
CONT 0 0%
Legal status of contractor
CONT 0 0%
If the contractor constitutes a joint venture, consortium or other unincorporated grouping of two or more persons then:
CONT 0 0%
1. These persons are deemed to be jointly and severally
CONT 0 0%
liable to the employer for the performance of this
0 0%
agreement
0 0%
2. These persons shall notify the employer of their leader
CONT 0 0%
who has authority to bind the contractor and each of
0 0%
these persons
0 0%
3. The contractor shall not alter its composition or legal
CONT 0 0%
status without the prior written consent of the employer
0 0%
Errata by JBCC
CONT 0 0%
Omit from definition of construction period the words : "excluding annual holiday periods"
0 0%
Omit from definition of preliminaries the word : "priced"
0 0%
F:............................. V:............................ T:............................
Item 1 0 0%
2 Clause 2.0 - Law, regulations and notices
CONT 0 0%
The above clause shall be deemed to be extended as follow
CONT 0 0%
Health and safety
0 0%
Health and safety
CONT 0 0%
The contractor shall:
0 0%
1. Comply with the health and safety specification for the
0 0%
works
0 0%
2. Prepare and agree with the health and safety
0 0%
consultant the health and safety plan for the works
0 0%
3. Co-operate with the health and safety consultant in all
0 0%
respects
0 0%
4. Manage the compliance of all subcontractors with the
0 0%
regulations and with the health and safety plan and
0 0%
specification
0 0%
health and safety specification
0 0%
F:............................V:.............................T:....................
0 0%
3 Clause 3.0 - Offer and acceptance
Item 1 0 0%
F:............................. V:............................ T:............................
0 0%
4 Clause 4.0 - Assignment and cession
Item 1 0 0%
F:............................. V:............................ T:............................
0 0%
5 Clause 5.0 - Contract documents
CONT 0 0%
Value Added Tax
CONT 0 0%
Provision is made in the summary page of these bills of quantities for the inclusion of Value Added Tax (VAT)
CONT 0 0%
Contract drawings
CONT 0 0%
The contract drawings will be as listed at site handover [5.1]
CONT 0 0%
Priced document as specification
CONT 0 0%
The principal agent shall decide which portion of the priced document may be used as a specification of materials and goods or methods, if any
CONT 0 0%
Electronic issue of drawings
CONT 0 0%
All drawings for this project will be issued electronically and the contractor shall be deemed to have received such drawings on the date that such drawings have been dispatched electronically [5.5]
0 0%
Precedence
CONT 0 0%
Clause 5.6 is deemed to be deleted. The provisions of this Bill No. 1 (Preliminaries) shall take precedence over any other documents which constitute this agreement [5.6]
0 0%
F:............................. V:............................ T:............................
Item 1 0 0%
Delegated authority
CONT 0 0%
The authority of the principal agent to issue contract instructions and perform duties for specific aspects of the works is delegated to agents as follows [6.2]
CONT 0 0%
Architect
CONT 0 0%
1.1 Duties :
CONT 0 0%
The architect is responsible for the architectural design, functional design and quality inspection of the works
0 0%
1.2 Contract instructions [17.0] :
CONT 0 0%
1.2.1 Rectification of discrepancies, errors in descriptions or
CONT 0 0%
omissions in contract documents other than this
0 0%
agreement
0 0%
1.2.2 Alteration to design, standards or quantity of the works
CONT 0 0%
provided that such contract instructions shall not
0 0%
substantially change the scope of the works
0 0%
1.2.3 The site [13.2.4]
CONT 0 0%
1.2.4 Compliance with the law, regulations and bylaws [2.1]
CONT 0 0%
1.2.5 Provision and testing of samples of materials and
CONT 0 0%
goods, of finishes and assemblies of elements of the
0 0%
works
0 0%
1.2.6 Opening up of work for inspection, removal or
CONT 0 0%
Sub-Total 1 0 0
Sub-Total 2 0 0%
VAT 14% 0 0
Sub-Total 3 0 0%